We develop a modular, hourly-resolution framework for long-term load forecasting on isolated grids, addressing the limitations of conventional monthly models in capturing weather-driven volatility and structural load growth. By adapting ERCOT’s Rank and Average procedure to a single-zone grid and integrating additive scenario re-trending, our method decouples weather normalization from data center and electric vehicle (EV) load growth. Applied to Jeju Island, the framework reveals distinct load-shaping effects: data centers shift the system base load, while EV charging intensifies the evening duck curve. Furthermore, extending the Rank and Average procedure to extract full percentile distributions enables a shift from deterministic forecasting to risk-aware capacity planning. Specifically, the P50 trajectory guides baseline generation investment, while the P95 upper bound provides an upper-tail planning margin for extreme-weather peaks. This hourly-resolution approach provides a quantitative basis for storage sizing, demand-response design, and transmission expansion.
| Original language | English |
|---|---|
| Pages (from-to) | 4123-4140 |
| Number of pages | 18 |
| Journal | Journal of Electrical Engineering and Technology |
| Volume | 21 |
| Issue number | 5 |
| DOIs | |
| State | Published - Aug 2026 |
Keywords
- Hybrid forecasting
- Long-term load forecasting
- Rank and average method
- Weather normalization
Fingerprint
Dive into the research topics of 'High-Resolution Long-Term Load Forecasting for Large-Scale AI Data Centers and Electric Vehicles Using Weather Normalization and Scenario Analysis: A Jeju Island Case Study Based on the ERCOT Method'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver