Skip to main navigation Skip to search Skip to main content

Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop

  • Korea Advanced Institute of Science and Technology

Research output: Contribution to journal › Article › peer-review

75 Scopus citations

Abstract

This study focuses on a hybrid flowshop scheduling problem, in which there are serial stages, each with identical parallel machines. In the hybrid flowshop, each order is composed of multiple lots with the same due date, and each lot can be processed on any one of parallel machines at each stage. In addition, there are reentrant flows since lots of certain orders have to visit the stages twice. Heuristic algorithms are suggested for the scheduling problem with the objective of minimizing total tardiness of a given set of orders. In these algorithms, the list-scheduling method is employed, and lots are scheduled with priorities determined with a construction method. Computational experiments are performed on randomly generated test problems. Results show that the suggested algorithms perform better than well-known dispatching rules for various scheduling problems and an algorithm that is used in a real system.

Original languageEnglish
Pages (from-to)2149-2167
Number of pages19
JournalInternational Journal of Production Research
Volume43
Issue number11
DOIs
StatePublished - 1 Jun 2005

Keywords

  • Heuristics
  • Hybrid flowshop
  • Reentrant flows
  • Scheduling

Fingerprint

Dive into the research topics of 'Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop'. Together they form a unique fingerprint.

Cite this